Roof Assessed First
SANS 10106 requires a competent person to assess the roof for the collector and its wind and rain loads before anything goes up. Cape Town's summer south-easter can reach gale force.
Home / Solar Geyser Installation
Solar geyser installation in Durbanville starts with two decisions: thermal collectors or a PV geyser, and for a thermal system, direct or indirect. We advise from your water supply and your roof, install to SANS 10106, notify the City and put the backup element on a timer.
Tell us about the house and the geyser you have now, and we will arrange to look at the roof before we put a price on it.
A solar geyser is a roof job and a plumbing job, with an electrical backup behind it. These are the parts of the installation that decide how well it performs once the installer has gone.
SANS 10106 requires a competent person to assess the roof for the collector and its wind and rain loads before anything goes up. Cape Town's summer south-easter can reach gale force.
Collectors face true north, within 45 degrees either way, tilted for the winter sun, and placed where nothing shades them between 09:00 and 15:00.
A pressure control valve, vacuum breakers on the cold supply and the hot draw-off, the safety valve, and a drip tray wherever the tank sits under the roof.
Solar-heated water can reach very high temperatures, so a thermostatic mixing valve keeps what comes out of the tap at a temperature that will not scald.
The element should wait for the sun. The City's advice is a timer that keeps it off through the sunny hours and, if it is needed, boosts at about 4pm for an hour.
Hot pipes lagged, as SANS 10106 requires wherever heat could be lost, so the heat collected on the roof is still there when it reaches the tap.
Every thermal solar geyser comes down to one plumbing choice. In a direct system, the household water itself runs through the collector on the roof. An indirect system keeps the household water off the roof altogether: a closed loop of heat transfer fluid runs through the collector and passes its heat to the tank through a heat exchanger. SANS 10106 notes that an indirect system loses a little efficiency at the heat exchanger, and in return its collector circuit is protected from frost, boiling, corrosion and scale.
On City water, Durbanville is well placed for a direct system. The City of Cape Town's 2024/25 tap water analysis puts total hardness between 15 and 42 mg/L across the Wemmershoek, Blackheath and Voëlvlei supplies, which are the schemes its supply tables list for Durbanville. The City's own water heating guidance says hard water is very uncommon in Cape Town and that direct systems are well suited to local needs.
Borehole water is a different matter, and it is the reason to test before choosing. SANS 1307, the standard solar water heaters are built to, warns that some borehole water carries a very high chloride content and recommends analysing it before installing a system with stainless steel or aluminium components. Kwikot's installation manual limits its direct flat-plate panels to water under 600 ppm of total dissolved solids and specifies an indirect system above that. If your geyser is fed from a borehole or a wellpoint, the water test comes before the quote.
Frost is the other half of the decision, and here the sources do not agree. The City's guidance says Cape Town has no freezing risk, yet the weather service's long-term record for Cape Town airport shows lows of minus 1 °C in June and July, and Kwikot's warranty excludes freeze damage to direct flat-plate panels installed where the temperature drops below 5 °C. An indirect system, or a direct evacuated-tube system built for frost, takes the question off the table.
Before you sign a quote: ask whether the system is direct or indirect and why, and look for the sticker SANS 1307 requires on the collector glazing, which has to state in letters at least 30 mm high whether the collector is resistant to freezing. On City water with a frost-rated collector, direct is the sensible choice. On borehole water, test it first. If the geyser you have now is the problem rather than the way it is heated, geyser installation in Durbanville covers replacing it.
A system matched to your water and your roof, installed to the standards that apply to it, with the paperwork done rather than left to you.
There are three ways to put the sun to work on your hot water, and the City and the standards ask for something different in each case.
No embedded generation authorisation is needed. The Water By-law still requires the City to be notified when solar hot water panels go in, and PIRB requires a certificate of compliance for the work.
PV panels feeding the geyser element need City authorisation through its embedded generation process, a switch from its approved list, and the DC wiring signed off by an installation electrician.
A retrofit adds collectors and a pump to the geyser you have. SANS 1307 requires the pressure ratings to match, and on a new build a retrofit may not satisfy SANS 10400-XA.
It depends on four things: whether you are converting the geyser you have or starting fresh, the type of collector, the size of the tank, and what the roof needs before it can carry the load. The City of Cape Town's sizing guide is at least 50 litres of storage per person plus another 50 for the house, which is a sensible place to start. We look at the roof and the existing geyser before quoting, and the quote names the system type, the tank size and every item on it, so two quotes can be compared line by line.
The City of Cape Town puts the saving at up to about 60% of your hot water bill, with payback on a standard flat-plate, close-coupled system typically between three and six years. Winter is the weak season: the long-term average at Cape Town airport is about 176 hours of sunshine in June against 338 in December, so the backup element does more of the work from May to August. Putting that element on a timer is what protects the saving.
Yes, if the geyser is in good condition and its pressure rating can be matched. A retrofit connects collectors and a circulation pump to the geyser you already have, and SANS 1307 requires the solar side's pressure rating to match the existing geyser's. We check the existing tank first, because a retrofit ties new collectors to an old geyser and it is worth knowing how much life it has left. On a new build, or an alteration that needs plans, a full system rather than a retrofit may be needed to satisfy SANS 10400-XA.
Neither wins everywhere. The City of Cape Town describes flat-plate collectors as robust, economical and versatile. Evacuated tubes generally produce more hot water when the sun is weak and the weather is cold, and they are less sensitive to which way the roof faces, but they are more likely to break in hail and can overheat in summer. On a well-placed, north-facing roof, flat plates are the straightforward choice; tubes earn their place where the roof angle or the winter sun is working against you.
A close-coupled system has the tank on the roof directly above the collector, and the hot water rises into it on its own, with no pump and no electricity, so it keeps heating during load shedding. It is the most common and least expensive arrangement. A split system puts the tank away from the collector, for example inside the roof space, and often uses a small pump to circulate the water, which needs electricity but keeps the tank out of sight. A tank under the roof also needs a drip tray, the same as an ordinary geyser.
For a thermal system, no authorisation is needed, but the Water By-law requires the City to be notified when solar hot water panels are installed or changed, and the plumber completes a certificate of approval for the work, which the City processes at no cost to the owner. A PV geyser is different: it must be authorised through the City's small-scale embedded generation process, and the PV geyser switch has to be on the City's list of approved equipment.
Sometimes. The City of Cape Town recommends a heat pump for homes that do not get much direct sunshine, or whose roof lacks the space or the construction to carry a solar water heater, and notes that heat pumps also cope better with coastal fog and haze. A heat pump works off the electricity supply rather than the sun, and Eskom describes it as three times more energy efficient than an element geyser under ideal conditions. If your roof faces the wrong way or sits in shade for most of the day, we will tell you so before quoting for solar.
Have it checked about once a year, which is what the City's guidance suggests. The collector glass needs cleaning, the sacrificial anode in the tank may need replacing every few years, and the lagging on the outside pipes should be checked for perishing. An indirect system also needs its heat transfer fluid replaced on the manufacturer's schedule: Kwikot sets it at three years, and the City's guidance says four to five.
The things that come up again and again in local reviews, and the things we care most about getting right.
You get the price before we start, so there is no surprise call-out fee on the invoice.
Quick call-outs across Durbanville and the northern suburbs during business hours.
Based in Durbanville and quick to reach right across the northern suburbs.
We treat your home with care and clean up before we leave.
Get In Touch
Thinking about solar? Send us the details and we will arrange to look at the roof and the geyser before we quote.